Forum Discussion
lefterav
Nov 21, 2024Copper Contributor
New planner doesn't show a "schedule" view of tasks assigned to me from different plans
The new version of web-based Planner was enabled for me a few days ago, on November 17th. Apparently, I realized that one of the features I used is missing.
At the "My Tasks" view, in the old version of Planner, one could choose to have different views, apart from the grid view. The most useful one for me was the "schedule" view, since I could see in one calendar, all assigned tasks from different plans/teams/projects. This functionality now seems to have been removed, and one can only see one separate schedule per plan.
- JimEngentCopper Contributor
This was an intentional change by Microsoft. They don't know why they did it and have said they're going to fix it this month.
- Eric_GoldmanCopper Contributor
I'm having the same issue.
- BrianSmithPhotosBrass Contributor
The Board view in My Tasks is coming back, rollout should begin this month, according to the public Roadmap - https://www.microsoft.com/en-us/microsoft-365/roadmap?msockid=2ca37435d0c968a52b7560dcd18569e3&filters=Planner